Mass Pike detour: I-90 westbound closed at I-495

Date:

At the very least it’s not falling concrete. Right here’s the most recent on the Mass Pike detour as a result of “a construction trench settlement.”

MassDOT says …

The Massachusetts Division of Transportation (MassDOT) is saying that I-90 westbound on the I-495 interchange is presently closed for emergency restore operations after a development trench settlement fashioned within the low-speed lane as a result of close by development.  All site visitors on I-90 westbound is being detoured onto Route 9 at exit 111 in Framingham.

Crews are working to repair the problem and re-open lanes. Drivers ought to anticipate delays and are inspired to hunt an alternate route.

The period of the highway closure is presently unknown, however is predicted to increase by means of the morning.

Drivers touring by means of the affected areas ought to anticipate delays, cut back velocity, and use warning.

For extra info on site visitors circumstances, vacationers are inspired to:

Obtain the Mass511 cellular app or go to www.mass511.com to view reside cameras, journey instances, real-time site visitors circumstances, and venture info earlier than setting out on the highway. Customers can subscribe to obtain textual content and e-mail alerts for site visitors circumstances.

Dial 511 and choose a route to listen to real-time circumstances.

Observe @MassDOT on X, (previously often called Twitter), to obtain common updates on highway and site visitors circumstances.

Share post:

Subscribe

Latest Article's

More like this
Related

10 displaced after 4-alarm Roslindale home hearth

Ten individuals had been displaced and two had been...

Open Newbury kicks off summer time collection to final by means of September

Newbury Road closed to vehicles and welcomed a wealth...

Boston Metropolis Councilors, Secretary of State urge firm to resolve trash strike

The Secretary of State and several other members of...